Internships Nigerian Jobs

Apply Egbin Power Internship Students Industrial Training Programme 2019

Apply Egbin Power Internship Students Industrial Training Programme 2019

EGBIN POWER PLC, Lagos is a leading electricity industry in Nigeria. Often seen as the most significant single generating power station in Black Africa, it was built to meet every rising demand for electricity in Lagos and its environs.

Before the construction of the Egbin Power Plc, Lagos, the Ijora Power Station which is reputed as the oldest power generating plant in the country was the main source of electricity supply around.

The Student should be on Second Class Upper (2:1), or it’s equivalent as at the time of submitting the application

READ: Apply For NHEF Scholarship Essay Competition For Nigerian Students 2019

Applicants Field of Study

  • Engineering
  • Applied Industrial Science
  • Environment Technology
  • Information Technology
  • Finance

Duration:

July 2019 – December 2019

How To Apply For Egbin Power Internship Students Industrial Training Programme 2019

Click here To Apply

Deadline: May 31st 2019

READ: New Entries At ExxonMobil Apprentice Program 2019 for young Nigerians

Leave a Comment